ANALISA PRESSURE BUILD UP SUMUR SYL-001 LAPANGAN X

Rekahidaya Rekahidaya, Lestari Lestari, Ridha Husla

Abstract


Pada pengujian ini dilakukan pada sumur SYL-001 dengan menggunakan metode pressure buildup test secara perhitungan manual dengan metode Horner melalui pendekatan Ψ(


Full Text:

PDF

Article Metrics

Abstract views : 25| PDF views : 0

References


Ahmed, T. (1946). Reservoir Engineering Handbook Second Edition. Gulf Professional Publishing.

Bourdet, D. (2002). Well Testing and Interpretation. Elsevier Science. Chaudhri, A. U., (2003).Gas Well Testing.Gulf Publishing Company, Houston,Texas.

Halliburton. (2012). Interpreting Pressure Transient Tests.

Hurst, W. dkk. (1961). Some Problem in Pressure Build Up.

John P. Spivey and W. John Lee. (2013). Applied Well Test Interpretation.Society of Petroleum Engineers

Lee, J. (Texas A.U. & Wattenbarger, R. A. (Texas A. U. (1996). Gas Reservoir Engineering - SPE Textbook Series Vol. 5.

Nurhilalia. (2016). Analisa data pressure build up test dengan menggunakan metode horner untuk mengetahui produktivitas sumur-x.

Ole S. Fjaerae, et, al (2012). Dynamic Data Analysis

Stewart, G.(1940). Well Test Design and Analysis


Refbacks

  • There are currently no refbacks.