Reader Comments

AiPeeHmrStnfzdsE

"Michale" (2018-11-23)

 |  Post Reply

Where did you go to university? generic tricor 145 mg “The problem is not the route, but perhaps, the signalling system on the route. In fact, the safety system should be adaptable, flexible for any kind of route. Because as well as straight lines for travelling fast, high speed trains have to link up with the conventional network, to get into towns. And so, it is not about having routes that run in straight lines, but about lines being safe from A to B.”

Add comment